PE PP PPR Pipe Water Drainage Hose Tube Making Extrusion production Machine
Our PE PP PPR Pipe Water Drainage Hose Tube Making Extrusion production Machine Use high efficiency single screw extruder, has high automation degree and high output. Use famous-brand electric parts. Pipes produced by Cool and PE PP PPR Pipe Water Drainage Hose Tube Making Extrusion production Machine are of high quality, Mainly used for water supply.
Features ofPE PP PPR Pipe Water Drainage Hose Tube Making Extrusion production Machine :
1. Use high efficiency single screw extruder
2. PLC control system
3. Stable extrusion




Machine type:
Model |
Pipe diameter |
Extruder |
Max. capacityKG/H |
Total powerKW |
SKPPR/HDPE-63(Single) |
Φ 20-Φ 63 |
SJ65/33 |
120-150 |
100 |
SKPPR/HDPE-125(Single) |
Φ 75-Φ 125 |
SJ65/33 |
180-220 |
130 |
Equipment List: |
- Single Screw Extruder 1 unit
- Mould 1 set
- Vacuum Water Tank 1 unit
- Water Cooling Tank 1 unit
- Haul-off Machine 1 unit
- Cutting Machine 1 unit
- Stacker 1 unit
Optional Auxiliary Machine;
- Crusher 1 unit
- Mixer 1 unit
- Pulverizer 1 unit
- Air Compressor 1 unit
|
Trade Terms |
- Payment Term: 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be acceptable
- Delivery Time: 40 days after receipt of prepayment.
- Packing Method: Packing film or wooden case
- Guaranteed Time: 12 months
|
Machine Test and After Service |
- When machine finished, we will invited client come to our factory to check the machine and do the machine test. If machine is ok, then client pay for the balance. And inspect machine load the container.
- When machine arrives client's factory, if client needs, we will send 1-2 engineer to client's factory do the machine installation and running test, and also train the local worker how to operate and maintain the machine. It is chargeable.
|
