PE Large diameter corrugated pipe production line
Application of HDPE pipe:
Mainly used in the area of agricultural water supply system, architectural water supply system, pavement of cables, etc.
Equipment List:
1. Single Screw Extruder
2. Extrusion Mould
3. Vacuum Tank
5. Haul-off Machine
6. Cutting Machine
7. Stacker
Machine's Feature
1. Single screw extruder and haul-off unit have applied imported A/C inverter, both vacuum pump and driving motor have applied excellent products.
2. High quality PE pipe extruder machinery.
3. The haul-off unit includes two-claw type, three-claw type, four-claw type, six-claw type, eight-claw type, ten-claw type, twelve-claw type, etc. Scraps free cutting, saw cutting or planetary cutting can be applied, the property of machine group is reliable, the production efficiency is high.
4. With special device, it can produce inner wall spiral pipe, inner wall hollow pipe, and core layer bulpo pipe, etc,
5. Large Diameter HDPE Water Supply and Gas Supply Pipe Extrusion Line can also produce PP, PE, ABS, PPR, PEX, silicon core pipe and pipe material of other material. The planetary cutting machine is fully automatic computer digital control, it has such advantages of simple operation, reliable property, etc. It has reached world advanced level.
Large Diameter HDPE Water Supply and Gas Supply Pipe Extrusion Line |
Pipe diameter(mm) |
Extruder |
Max.Output(kg/h ) |
Total power(kW) |
HLPEG-800 |
Φ450~Φ800 |
SJ90/33
SJ90/33 or 120/33 |
400-1000 |
600 |
HLPEG-1200 |
Φ800~Φ1200 |
SJ90/33
SJ120/33 or 150 /33 |
550-1600 |
840 |
HLPEG-1600 |
Φ1000~Φ1600 |
SJ105/33
SJ120/33 or 150 /33 |
1000-1700 |
900 |
TRADE TERMS
Payment Term: 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be acceptable
Delivery Time: 40 days after receipt of prepayment.
Packing Method: Packing film or wooden case
Guaranteed Time: 12 months
MACHINERUNNING TEST AND AFTER SERVICE
When machine finished, we will invited client come to our factory to check the machine and do the machine test. If machine is ok, then client pay for the balance. And inspect machine load the container.
When machine arrives client's factory, if client needs, we will send 1-2 engineer to client's factory do the machine installation and running test, and also train the local worker how to operate and maintain the machine. It is chargeable.
If have any question or problem on machine operation or maintain, welcome to contact to us by email or calling. We stand by 24 hours.