PP PE PPR Water Pipe Drainage Tube Electrical Hose Production Extrusion Extruder Line
Application:
Diameter 16mm-800mm series PP PE PPR Water Pipe Drainage Tube Electrical Hose Production Extrusion Extruder Line is mainly used in the manufacture of plastic PVC pipes with various diameters and wall thickness used in the industried such as agriculture and constructional plumbing, cable laying etc, it also named PVC Pipe Production Line, PVC Pipe making machine.
Equipment List:
1. single Twin Screw Extruder
2. Mould
3. Vacuum Shaping and Cooling Tank & spraying water tank
4. Haul-off Machine
5. Cutting Machine
6. Stacker.
WHY CHOOSE SUKE?
(1) We have experiences in this field since 2002
(2) We have strong technical teams and cooperate with China scientific institution to develop, improve and test our machine, to ensure what customers get are the most reliable machines from China.
(3) We select the most reliable mechanical and electrical parts for our machine with all famous reliable brands, with European CE and ISO9001 certificated.
(4) We put our heart into every business with aim of long term cooperation.
(5) We have perfect service system-- Our president is devoting himself to pre-sale, on-sale and after-sale service.
Main extruder |
SJSZ-51/105 |
SJSZ-65/132 |
SJSZ-80/156 |
SJSZ-92/188 |
Main motor power(KW) |
22 |
37 |
55 |
110 |
Pipe diameter(mm) |
16- 63mm |
75-160mm |
200-400 |
400- 630 |
Hauling speed(m/min) |
0.8-10 |
0.5-5 |
0.3-4 |
0.2-3 |
Max. Capacity(kg/h) |
120 |
260 |
400 |
600 |
Total power(KW) |
89 |
95 |
135 |
255 |
V. Trade Terms |
- Payment Term: 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be acceptable
- Delivery Time: 40 days after receipt of prepayment.
- Packing Method: Packing film or wooden case, 1*20 GP, 1* 40 GP.
- Guaranteed Time: 12 months
|
VI. Machine Test and After Service |
- When machine finished, we will invite client come to our factory to check the machine and do the machine test. If machine is ok, then client pay for the balance. And inspect machine load the container.
- When machine arrives client's factory, if client needs, we will send 1-2 engineer to client's factory do the machine installation and running test, and also train the local worker how to operate and maintain the machine. It is chargeable.
|