Plastic Extruder Machine / HDPE PPR PP Pipe Machinery
This corrugated production line can be used to produce single-wall or one wall corrugated pipes of PE, PP, PVC, EVA continuously, as well as PA corrugated pipes.
Plastic single-wall corrugated pipes have features of high temperature resistance, resistant to corrosion and abrasion, high intensity, good flexibility, etc.
They are widely used in fields of auto wire, electric thread-passing pipes, circuit of machine tool, protective pipes of lamps and lanterns wire, tubes of air conditioner and washing machine, etc.
Plastic single-wall corrugated pipe production line developed by our company adopts gears to run moulds and templates so as to realize water circulating cooling and air cooling of the products, which ensures high-speed molding, even corrugation, smooth inner and outer pipe wall.
These corrugated pipes are especially used as wires of the up-market cars, electric conduit pipe passing, washing machine, air conditioner pipe, lamp pipes, etc.
Machine parts list:
1>Single screw extruder: SJ-45/30, 65/30
2>Corruated pipe mold: 50-72pairs
3>Corrugated pipe forming machine
4>Double station winder
5>Electric control cabinet.
If you want more details about plastic extruder, please contact us.
Model of the single screw extruder |
SJ-30B |
SJ-45B |
SJ-65B |
SJ-90B |
SJ-120B |
SJ-150B |
screw of the extruder(L/D) |
25-33 |
25-33 |
25-33 |
25-33 |
25-33 |
25-33 |
Power of the extruder(kw) |
2.2-7.5 |
7.5-22 |
18.5-55 |
55-185 |
90-280 |
110-300 |
Heating Power (kw) |
5-8 |
6-12 |
12-18 |
16-40 |
20-60 |
30-80 |
Cooling Style |
By Fans and Water |
Max. Extruding Capacity (kg/h) |
18 |
60 |
180 |
450 |
650 |
950 |
TRADE TERMS
Payment Term: 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be acceptable
Delivery Time: 40 days after receipt of prepayment.
Packing Method: Packing film or wooden case
Guaranteed Time: 12 months
MACHINERUNNING TEST AND AFTER SERVICE
When machine finished, we will invited client come to our factory to check the machine and do the machine test. If machine is ok, then client pay for the balance. And inspect machine load the container.
When machine arrives client's factory, if client needs, we will send 1-2 engineer to client's factory do the machine installation and running test, and also train the local worker how to operate and maintain the machine. It is chargeable.
If have any question or problem on machine operation or maintain, welcome to contact to us by email or calling. We stand by 24 hours.