PVC Marble Board
Making Machine (SJSZ80X156)
MACHINE INTRODUCITON:
PVC marble board is widely as widely used as decorative. As high quality decorative sheet, it use medium density PVC microlite as raw material, copy the marbling on the surface by UV photocuring technology. It looks like real marbie,has smooth surface, and high reflective rate.
MACHINE FEATURES:
This line has the features of compact structure, high performance.
After special design, screw and barrel has the features of uniform plasticization, stable extrusion capacity, high output, long service time.
Barrel adopts cast aluminum heating ring, fan cooling and precision temperature control system.
Calander can adjust the sheet shape and keep product in good situation by precision design. Cutting machine has meter counting device, and cut the board in right with no error.
MACHINE DETIALS:
Model |
SJSZ80/156 |
Screw diameter mm |
φ80-156 |
Motor Power kw |
55 |
Heating power kw |
36 |
Screw rotation speed r/min |
1-32 |
Output per day t |
8 |
Board Specification mm |
1220x2440 |
Total Power kw |
150 |
THIS LINE IS CONSISTE OF:
1. 80/156 Twin Screw Extruder 1unit
2, L=1320 Mould 1set
3, Dedicated Mould Temperature Controller 1set
4, Three Roller Calander 1unit
5. Dedicated Double Position Hot Laminating Platform 1unit
6, Cooling Stacker 1unit
7, Haul-off Machine 1unit
8, Lengthways Side Cutting Device 1unit
9, Board Cutting Machine 1unit
10,Riding wheel Platform 1unit
11,Electrical Device Full set
Optional Auxiliary Machine;
- Crusher 1 unit
- Mixer 1 unit
- Pulverizer 1 unit
- Air Compressor 1 unit
TRADE TERMS:
Payment Term: 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be acceptable
Delivery Time: 40 days after receipt of prepayment.
Packing Method: Packing film or wooden case, 1*20 GP, 1* 40 GP.
Guaranteed Time: 12 months
MACHINE RUNNING TEST AND AFTER SERVICE
1. When machine finished, we will invite client come to our factory to check the machine and do the machine test. If machine is ok, then client pay for the balance. And inspect machine load the container.
2. When machine arrives client's factory, if client needs, we will send 1-2 engineer to client's factory do the machine installation and running test, and also train the local worker how to operate and maintain the machine.
COMPANY SHOW: