MACHINE INTRODUCTION:
Certificate: CE, ISO9001:2008, SGS,
Brand Name: SUKE
Output of PVC Board: 600kg/h
Dimension of PVC Foam Board:1220*2440*(3-30)mm
Plastic Processed: PVC and WPC
Application of Finished Board: Formwork, Furniture board, cabinet board, building template, advertisement board, wall panels, floor, roof, car and boat board etc.
Screw Design: Double-screw
Model Number: SYSJ80/156
Density of finished board: 0.37-0.85
Voltage: 380-440V
Main Motor Power: 90kw
PRODUCTION PROCESS
Raw materials--- Mixing --- Feeding --- Extruding ---Molding --- Calibrating --- Haul-off --- Cutting--- Stacking--- Printing or Hot stamping --- Package.
MACHINE FEATURS
PVC Foam Board Machine adopts Celuka foam technology, which can produce a kind of PVC foam boards with superior quality. These processes result in a "skinning" or outer layer of foam board, thus has smooth and shining surface with characteristics of lightweight, scratch-resistant, durable, water and weather resistant, anti-corrosion, impervious to salts, insects and many chemicals including some acids.
2. PVC foam board can be100% recycled and reused. Besides, PVC foam board can be worked like wood with the tools for wood. It's suitable for sawing, cutting, nailing, screwing, planning and sticking. It's the perfect substitute for wood plates and steel plate.
3. The foam board is mostly used in transportation, advertisement, construction and furniture industry, ect.
4. The board thickness is from 3mm to 35mm, width is from 915mm to 1220mm.
EQUIPMENT LIST:
Double Screw Extruder 1 unit
2. Mould 1 set
3. Shaping Machine 1 unit
4. Haul-off Machine 1 unit
5. Cutting Machine 1 unit
6. Stacker 1 unit
Optional Auxiliary Machine;
1. Crusher 1 unit
2. Mixer 1 unit
3. Pulverizer 1 unit
4. Air Compressor 1 unit
TRADE TERMS
Payment Term: 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be acceptable
Delivery Time: 40 days after receipt of prepayment.
Packing Method: Packing film or wooden case
Guaranteed Time: 12 months
MACHINERUNNING TEST AND AFTER SERVICE
When machine finished, we will invited client come to our factory to check the machine and do the machine test. If machine is ok, then client pay for the balance. And inspect machine load the container.
When machine arrives client's factory, if client needs, we will send 1-2 engineer to client's factory do the machine installation and running test, and also train the local worker how to operate and maintain the machine. It is chargeable.
If have any question or problem on machine operation or maintain, welcome to contact to us by email or calling. We stand by 24 hours.